Industrial
Energy From Waste Plant
Requirements
To oversee the redesign and installation of a 2197m² administration block that forms part of an extensive multimillion-pound project.
Outcomes
Joining the team at the post planning approval stage, MWA is responsible for the redesign of the administration block.
This is a significant project for the MWA team and calls on our expertise of working with multiple international partners and within the energy and industrial sector.