Industrial
Associated Waste Management
Requirements
To design a building that would enclose the existing waste transfer station. Ensuring that the facility remained fully operational throughout the construction process.
Outcomes
Structural columns, located around the existing process plant, were designed in three pieces to support the rear excavation. Positioned within strict boundaries and close to a railway line the building was designed to maximise space and the through-put of waste.
MWA has been my ‘go to’ architectural practice for well over two decades. They have carried out numerous residential, commercial and industrial projects for me and always ensure that they complete on time and on budget. I would highly recommend them.